Backdrop Construction


Backdrop uprights in place on the Elkins end




Another shot of supports



A sea of supports!  Looking toward Thomas and Bayard




Moved computer to a shelf I build underneath the Elkins engine terminal




Now you see it, now you don't - folded underneath the layout for storage



Power pole - since the layout is an island-style, the 110V connection is dropped from above through the backdrop




Blue J-channel used to support the top edge of the backdrop




Backdrop material is 24" x 50' pre-primed aluminum trim coil




J-channel applied to top of supports




Another view of the J-channel




Overhead view of backdrop supports




Other end of the layout is partially complete



Securing curves by using a dowel on each side



Rolling out the first 50 feet - got this done in 35 minutes!



Completed hanging 210 feet of trim coil in 3 hours!


Looking across from Parsons to Thomas



Looking down the Blackwater Canyon



Hendrix is on the left, Thomas on the right



Beryl is in the foreground, Luke is in the distance


Westernport in the foreground, Luke is in the curver



Westernport is in the distance, Lonaconing will be on top of the helix someday



Elkins engine terminal is in the foreground, Elkins yard is the long Homasote expanse to the rear




Dave's doing a great job with the backdrop joints!


Painted backdrop

It's painted!  Notice the subtle white from about midway down to the horizon.


Backdrop - overview

Another view of the painted backdrop


Looking down the canyon!

Looking at Parsons on the right and Thomas on the left.  Blackwater Canyon is all the way
down at the end of the aisle

Last Updated on 29 Jul 2011                         [Back]                                                     [Home]